Javac A2L Commissioning Kit | Vacuum Pump, TurboFlow Hose Kit & Micron Gauge

Javac A2L Commissioning Kit | Vacuum Pump, TurboFlow Hose Kit & Micron Gauge

£799.99
Sale price  £799.99 Regular price  £844.32
Skip to product information
Javac A2L Commissioning Kit | Vacuum Pump, TurboFlow Hose Kit & Micron Gauge
1/3

Javac A2L Commissioning Kit | Vacuum Pump, TurboFlow Hose Kit & Micron Gauge

Javac
  • UK stock – fast dispatch
  • UK Mainland Delivery £7.50
  • Expert technical support
  • Trade accounts available
£799.99
Sale price  £799.99 Regular price  £844.32
Shipping calculated at checkout.
REFcom Elite registered supplier
Achilles Silver accredited supplier
UK HVAC specialist since 2005
Fast UK dispatch

✓ Trade Pricing | ✓ Technical Support Available | ✓ Secure Checkout

Javac A2L Commissioning Kit

Everything an HVAC engineer needs to commission A2L refrigerant systems correctly and efficiently. This kit combines the Javac CC-31-A2L spark-proof vacuum pump, the JAV-1422 TurboFlow Vacuum & Charging Kit, and the JAV-1041 digital micron gauge — a complete, professional-grade A2L commissioning setup from a single UK-stocked source.

Save £44.33 vs buying components separately. All items UK stocked by Javac for fast replenishment.

What's Included

  • 1× CC-31-A2L — Javac Edge 1.4 CFM double stage A2L/A3 spark proof vacuum pump, 15 micron ultimate vacuum, 110/240V, 4.5 kg
  • 1× JAV-1422 — Javac Edge TurboFlow Vacuum & Charging Kit, including 2× 3/8" hoses, 2× core removal tools, Veloci-Tee and Veto Pro Pac Hose Hauler bag
  • 1× JAV-1041 — Javac Edge digital micron vacuum gauge for accurate evacuation verification to F-Gas standards

Why This Kit?

  • A2L Ready — CC-31-A2L is spark proof and certified for R32, R1234yf and all A2L/A3 refrigerants
  • TurboFlow Evacuation — 3/8" ID hoses and core removal tools dramatically reduce pull-down times vs standard 1/4" setups
  • Verified Evacuation — JAV-1041 micron gauge confirms system reaches and holds target vacuum before refrigerant charge
  • F-Gas Compliant Workflow — covers the full evacuation and verification process required under F-Gas regulations
  • UK Stocked by Javac — fast replenishment on all components; no long lead times

Component Links

Need Technical Information?

View Technical Resources

You may also like